The Weatherford Ledger Sunday, November 1, 2026

Get the Ledger by email, free

The Growth Ledger

Week of Oct. 4, 2026. Edition 2.

The Growth Ledger is the weekly record of what is being built, decided and taxed in the Weatherford ISD footprint. This second edition is built from the county's posted tax order (Order 26-42), the city's approved Sept. 8 council minutes, the district's Sept. 14 tax-rate notice, the Comptroller's active sales-tax permit list and the state's construction registry (TDLR TABS), each read Oct. 4. All three 2026 tax rates on a Weatherford home are now adopted. Rows are pulled from the government sources linked in each row and checked by an editor before publication.

Editions: Week of Oct. 11, 2026 (Edition 3) · Week of Oct. 4, 2026 (Edition 2) · Week of Sept. 18, 2026 (Edition 1). The newest edition is always at /growth-ledger/.

Get the weekly record of what is being built, decided and taxed

A free, source-linked briefing on what Weatherford is building, deciding, taxing and changing, sent two or three mornings each week.

No paywall, no ads sold against a story, and your address is never sold or shared.

$0.392246
City of Weatherford FY27 tax rate, adopted Sept. 8 (Ordinance O2026-34, 5-0)
$0.284719
Parker County 2026 tax rate, Order 26-42
$0.9342
Weatherford ISD 2026-27 tax rate, adopted Sept. 14
$120.8M
City-wide FY27 budget, adopted Sept. 8

The same square mile, 1955 and 1981

A wide wooden boardwalk over marsh grass at Lake Weatherford, Texas, under a hazy sky.
The boardwalk at Lake Weatherford, the city of Weatherford's reservoir on the Clear Fork of the Trinity, on the Hudson Oaks side of the county. Image: Forssa01 via Wikimedia Commons, CC0.

Property tax rates, 2026

Per $100 of taxable value. Each adopted rate comes from the unit's own record, linked in the row; the three together come to $1.611165, the Ledger's arithmetic (the Weatherford College district is not included). Run your own number in the 2026 tax estimator.

Taxing unit2026 ratePrior rateChangeStatus
City of Weatherford$0.3922460.000000
Weatherford ISD$0.9342see tax pages
Parker County$0.284719-0.000351

Plats and projects on the record

From the council minutes and the state's construction registry (TDLR TABS, Weatherford only, registered since Aug. 25, 2026); each row links to its source document. Costs and dates are as filed by the registrant; a registration is not a permit or a start.

ProjectWhereWhatStatusSource
Mathew Meadows EstatesPreliminary and final plats, 27 residential lots on about 21.13 acres at 1609 Old Dicey Rd. (SBDP-26-0006, SBD-26-0005)Approved 5-0 on consent, Aug. 25, 2026
StonegateFinal plat, two residential lots on about 0.508 acres along Cherry Street (SBD-26-0003)Approved 5-0 on consent, Aug. 25, 2026
616 CoveFinal plat, one lot on about 1.046 acres along Palo Pinto St. (SBD-26-0006)Approved 5-0 on consent, Aug. 25, 2026
The Archer Assisted LivingNew construction, single-story assisted living facility of 4-16 beds, 9,635 sq ft, at 3910 Tin Top Road; estimated cost $2,000,000, start Dec. 1, 2026 and completion Dec. 1, 2027 as filed (TABS2027001680); owner Aimwell Solutions, LLCRegistered with TDLR Sept. 22, 2026; no city plat or zoning case on the record as of Sept. 26
Fire Station 5, Phase II constructionDesign-build contract for Phase II construction services related to Fire Station 5 improvements, in an amount not to exceed $8,280,000Approved 5-0, Sept. 8, 2026, per the approved minutes
City of Weatherford Offices Renovation and ExpansionEstimated cost $2,600,000, start Sept. 20, 2026 as filed (TABS2027001546)Registered with TDLR Sept. 21, 2026
Costco #1735 Weatherford - Fuel Facility Generator AdditionEstimated cost $155,000, start July 13, 2026 as filed (TABS2027001971)Registered with TDLR Sept. 25, 2026
Security State Bank & Trust - WeatherfordEstimated cost $250,000, start Aug. 1, 2026 as filed (TABS2027001032)Registered with TDLR Sept. 14, 2026
Lake Weatherford RestroomsEstimated cost $85,000, start Oct. 1, 2026 as filed (TABS2027000775)Registered with TDLR Sept. 10, 2026

Housing

Public research series for the Weatherford ZIPs; see the housing page for the monthly figures.

New sales-tax permits

From the Comptroller's active sales-tax permit list for ZIPs 76086, 76087 and 76088, permits dated Sept. 28 to Oct. 2, 2026 (12 outlets; the two with street addresses are listed here); see New in town in the Oct. 3 edition for the full list. A permit is not an opening date.

BusinessWhereWhatWhen
Quickco Inc.119 N. Main St. Ste. 207, WeatherfordProfessional services, per the permit's industry codePermit dated Sept. 30, 2026
Shannon Ray147 College Park Dr., WeatherfordRetail, per the permit's industry codePermit dated Oct. 2, 2026

Infrastructure

Sources are linked in every row. Figures that come from a projection are labeled as projections. Where a record has not yet been confirmed, the cell says so. Edition 1 (week of Sept. 18) carried the city rate as proposed; it was adopted Sept. 8 and the approved minutes were posted Oct. 2. Corrections: editor@weatherfordledger.com.